A QINGDAO ZONGDA product-series websiteDEVELOPMENT & PRODUCTION DRILLING

Underground Drilling / Selection Guides

Single-Boom vs Twin-Boom Drilling Jumbos

Compare the working arrangement and face pattern; boom count alone is not a production guarantee.

Start with the face drawing

Send the intended face shape and hole pattern. Ask for the coverage diagram of the proposed feed and boom arrangement. Maximum width and height are not a substitute for checking the actual pattern against the diagram.

Review machine access

A twin-boom arrangement must still pass the access route and fit the setup area. Obtain the travel outline and operating envelope. Include the narrowest route dimensions and any restrictions at the face.

Compare utilities on the same basis

Identify the available electrical supply, water and other site services. Ask the quotation to specify the required utilities and the exact drilling configuration. Do not assume diesel travel means the drilling process uses the same power source.

Document the selection

Compare ZDFJ76A1 with ZDFJ76A2 using your task, space and utilities. Ask for expected operating arrangements under stated conditions, rather than assuming that two booms automatically produce twice the output.

Equipment to review

Reference model information and original technical sources are linked on the equipment pages. Confirm the proposed configuration and site requirements before purchase.

SPECIFY YOUR REQUIREMENT

Bring the operating conditions.
Request the right configuration.

Include drilling task, face coverage, site utilities, quantity and delivery destination in your inquiry.

Request a Technical Quote